Groundbreaking Solutions For A Solid Future

Stivers Ford

Project Overview

The Stivers Ford project in Birmingham's Palisades area, near Homewood, was a significant endeavor that repurposed the abandoned site of the former Virginia College into a bustling car dealership. This development not only revitalized a once-neglected property but also bolstered Birmingham’s economic landscape by increasing the capacity for vehicle inventory and enhancing service facilities.

Scope of Work:

  1. Site Preparation and Grading:
    Our team expertly handled the site preparation, grading a 1.5-acre building pad, parking lot, and underneath the parking deck. The 9 acre site's transformation required precise earthmoving and grading to ensure a solid foundation for the dealership's operations.

  2. Rock Hammering and Material Export:
    Given the challenging terrain, we conducted extensive rock hammering and exported substantial amounts of dirt, rock, concrete, and asphalt. This meticulous process ensured the site was ready for construction, maintaining structural integrity and preparing for further development stages.

  3. Road and Traffic Rerouting:
    To accommodate the dealership and minimize disruption to the surrounding area, we managed road and traffic rerouting. This included designing and implementing new traffic patterns that facilitated smooth access to the site, enhancing both safety and convenience for future visitors.

  4. Utility Installation:
    Our scope of work also included the installation of essential utilities such as water, sanitary sewer, and storm sewer systems. These installations were crucial for the dealership's operation, ensuring that all services were up to the required standards and ready for use.

  5. Milling and Paving:
    The final phase of the project involved milling and paving to create a durable and aesthetically pleasing surface for the dealership's parking areas and driveways. This attention to detail ensured a professional finish, aligning with the dealership’s high standards.

Challenges

Transforming the former Virginia College site into the new Stivers Ford dealership was not without its challenges. The terrain required significant rock hammering and material export, while coordinating road and traffic rerouting demanded careful planning and execution. Despite these obstacles, Bostic Trucking and Excavating succeeded in delivering a top-notch project through meticulous site preparation and expert utility installation.

Successes

Our ability to manage complex logistics and execute projects efficiently allowed us to complete this transformation smoothly, enhancing the area’s economic vitality and demonstrating our capability to handle large-scale, multifaceted projects. The new Stivers Ford dealership stands as a testament to our dedication to quality and our contribution to Birmingham's development.