Project Overview

The Roanoke Apartment demolition project for the University of Alabama was a fast-paced endeavor that required meticulous planning and flawless execution. Situated on the edge of the bustling Tuscaloosa campus, the 12-unit apartment complex was slated for demolition just one week before the university's move-in day, leaving Bostic Trucking and Excavating with a tight 10-day window to complete the entire project.

Understanding the urgency, our team was mobilized to begin the moment the last residents were moved out on a Saturday afternoon, allowing us to jump-start the operation. Within hours, we disconnected utilities, salvaged reusable materials, and set up erosion control measures to protect the surrounding environment. By Sunday morning, full-scale demolition was underway. Despite the extremely limited timeframe, our crews worked tirelessly through the weekend, systematically dismantling the building, removing trees and parking lots, and graded the site, completing the entire project in 6 days.

Project Challenges

The Roanoke Apartment demolition presented several significant challenges. The project’s location along the edge of the University of Alabama campus meant navigating heavy pedestrian traffic and managing limited site access amidst a busy student move-in period. Additionally, the project demanded rapid execution, as the demolition needed to be completed swiftly to avoid disruption to the university's schedule.

Project Solutions

The success of the project lay in strategic planning and proactive logistics management. By carefully scheduling our operations around peak traffic times and using experienced drivers to manage tight site access, we ensured smooth operations from start to finish. Our team’s ability to quickly adapt to the site's constraints and maintain a high level of safety throughout the process was crucial to completing the project efficiently and ahead of schedule.

The Results

The success of the Roanoke Apartment demolition was a direct result of our strategic approach and commitment to excellence under pressure. With a carefully crafted plan, our team was able to mobilize and execute the project with precision, ensuring that every task was completed on time and with minimal disruption to campus activities. By leveraging our expertise and attention to detail, we turned a challenging timeline into an opportunity to showcase our capabilities in high-stakes environments.

The demolition not only cleared the site for future university development but also demonstrated Bostic Trucking and Excavating’s ability to deliver exceptional results under tight deadlines and challenging conditions.

  • Project Name: Roanoke Apartment Demolition
    Location: University of Alabama, Tuscaloosa, Alabama
    Scope of Work:

    • Utility Disconnection: Safely disconnecting all utilities to prepare for demolition.

    • Erosion Control: Implementing measures to prevent erosion and protect surrounding areas.

    • Building and Foundation Demolition: Complete teardown of a 12-unit apartment complex.

    • Tree Removal: Clearing trees to make way for future development.

    • Parking Lot Removal: Dismantling and removing existing parking lot infrastructure.

    • Site Grading: Leveling and preparing the site for its next phase of development.

    • Topsoil Placement and Hydro Seeding: Restoring the site with topsoil and hydro seeding for erosion control and aesthetic enhancement.

    • Completion Time: 6 days